To fully utilize the calorific value of the fuel, the combustion products formed during combustion must be condensed by cooling below the dew point temperature. When this fuel potential is used, heating surfaces and outlets in contact with moist combustion products are made of corrosion-resistant materials.
Benefits of using condensing heat recovery units
Reduced fuel consumption:
New modern boiler 6-18%
Old boiler type NIISTU 20-23%
Reducing harmful emissions:
CO2 and NOX up to 50%
Installation example of an FRG heat exchanger behind a 10 MW boiler *
The payback period of the project will be 5 months of operation of the facility or 13 months from the start of its financing. Income for the first heating season will be UAH 1,443,420. or 22% of the investment amount. Income from operation in each subsequent heating season will amount to UAH 8,013,420. The warranty period for the equipment is 3 years. The design life is 15 years. The cost of servicing equipment 25,000 per month of the operational period will ensure guaranteed and stable operation of the facility.
Reduction of harmful emissions for a modern 10 MW boiler with an FRG installation:
NOx - 22.02 kg / year or a reduction of 23.6%
CO2 - 29 181.5 kg / year or reduction by 32.5%
Advantages of heat recovery units from Styx-Oil
- Proprietary bimetallic heat exchangers increase the durability of FRG by several times compared to stainless steels.
- The warranty period is 3 years. Project 15 years.
- Execution of turnkey works from the project to commissioning and service. Performing non-standard tasks.
- Manufactured in Ukraine. The price is several times lower than that of foreign analogues.
- The equipment and the company are certified in Europe.
- A wide range of equipment 0.5-100 MW.
A short list of completed projects in Ukraine
The company is ready to provide its customers with information about more than 100 completed projects in various industries and a wide range of applications. The efficiency of using our technologies, low payback periods, reliable and durable operation of the equipment is confirmed in every project.
st. Moscow, 21, Nizhyn;
st. Yarmarkovaya, 41/1, Priluki;
st. Shevchenko, 47-B, Chernigov;
st. Konstantinovskaya, 110, Priluki;
st. 1st May 172, Chernigov;
st. Kievskaya 60B, Rivne;
st. Zhukova 22, Rivne;
st. Videnskaya 21A, Rivne;
st. Friendship 40, Belaya Tserkov;
st. Belova, 6-a, Chernigov;
st. Polubotka, 95, Chernigov;
st. Gagarin, 17, Rivne;
st. Berezovsky, 20, Rivne;
st. Prince Vladimir, 75-b, Rivne
st. Miryushchenko, 41-B, Rivne
st. Rokovsky, 4-A, Chernigov;
Prospect Mira, 151-A, Chernigov;
Prospect Mira, 193 - A, Chernigov;
Victory Avenue 182, Chernigov;
st. P. Zaporozhets, 14, White Church
st. st. Kotelnikova, 62, Kiev;
st. Obolon tract for children hospital, Kiev;
st. Rest, 7, Kiev;
st. Naberezhno-korchevatskaya, 76, Kiev;
st. Boiler room Koncha Zaspa, Kiev;
st. Krasnoflotskaya 26, Kiev, Pushcha voditsa;
st. Saksaganskogo, 141, Kiev;
st. Prospect Science, 1, Kiev;
st. Konstantinovskaya, 64, Kiev;
st. Karmelyuka, 1, Zbarazh;
st. Lozivskaya, 8, Kharkov;
st. Friendship, 40A, Belaya Tserkov;
st. Grizodubovo, 84-B, Belaya Tserkov;
st. Korolenko, 49B, Belaya Tserkov;
st. Prikhodko, 101A, Kremenchug;
st. Boryschak, 20/3, Kremenchug;
st. Govorova, 28-A, Kremenchug.
- Stock: In Stock
- Model: FRG