Menu
Your Cart

A Static Waste Plant that is installed in 1 day!

A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!
A Static Waste Plant that is installed in 1 day!

The Ks 615 offers a same-day ‘plug & play’ guarantee – offload the unit from the trailer and raise into position, fit the steps, connect to mains electricity or generator, switch power on and start loading the plant with mixed waste. The Ks 615 is ‘patent pending’ and is ideal for processing Construction & Demolition (C&D) and other waste streams.


0грн.
  • Stock: In Stock
  • Model: Ks 615